The new frame and bells were installed in the tower on 12 and 13 July 2006
Radio Oxford Interview | A frame side going up | Raising the first bell | All bells installed |
Raising the tenor (2 MB AVI clip)
Fitting the tenor (2 MB AVI clip)
The new frame and bells were installed in the tower on 12 and 13 July 2006
Radio Oxford Interview | A frame side going up | Raising the first bell | All bells installed |
Raising the tenor (2 MB AVI clip)
Fitting the tenor (2 MB AVI clip)